GGG-T-2761
3.7.3 Riveted connections. Rivet holes shall be accurately punched or
drilled and shall have the burrs removed. Rivets shall be driven with pressure
tools and shall completely fill the holes. Rivet heads, when not countersunk or
flattened, shall be of approved shape and of uniform size for the same diameter
of rivet. Rivet heads shall be full, neatly made, concentric with the rivet
holes, and in full contact with the surface of the member.
3.7.4 Machine work. Tolerances and gages for metal fits shall conform to
the limitations specified herein and otherwise to the standards of good
commercial practice.
3.7.5 castings. All castings shall be sound and free from patching,
misplaced coring, warping, or any other defect which reduces the casting's
ability to perform its intended function.
3.7.6 Forgoings. All forgings shall be of uniform quality, free of
detrimental flash, scale, cracks, hard spots, cold shuts, and excessive cooling
stresses. Strength and other essential physical properties of the forgings
shall be adequate throughout the purpose intended.
4.
QUALITY ASSURANCE PROVISIONS
4.1 responsibility for inspection. Unless otherwise specified in the
contract or purchase order, the contractor is responsible for the performance of
all inspection requirements as specified herein. Except as otherwise specified
in the contract or purchase order, the contractor may use his own or any other
facilities suitable for the performance of the inspection requirements specified
herein, unless disapproved by the Government. The Government reserves the right
to perform any of the inspections set forth in the specification where such
inspections are deemed necessary to assure supplies and services conform to
prescribed requirements.
4.1.1 Responsibility for compl iance. All items shall meet all requirements
of section 3 and 5. The inspection set forth in this specification shall become
a part of the contractor's overall inspection system or quality program. The
absence of any inspection requirements in the specification shall not relieve
the contractor of the responsibility of assuring that all products or supplies
submitted to the Government for acceptance comply with all requirements of the
contract. Sampling in quality conformance does not authorize submission of
known defective material, either indicated or actual, nor does it commit the
Government to acceptance of defective material.
4.1.2 co mponent and material inspection. Components and materials shall be
_
inspected in accordance with all the requirements specified herein and in
applicable referenced documents.
4.2 Classifcation of inspection.
r
The inspection requirements specified
herein are classified as follows:
a. First article inspection (see 4.2.1).
b. Quality conformance inspection (see 4.2.2).
c. Packaging inspection (see 4.6).
5
For Parts Inquires submit RFQ to Parts Hangar, Inc.
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business